Solar

Rooftop Solar In Gurgaon

Gurgaon is the second district of Haryana. Especially in the last five years, it has seen rapid development and construction and is home to many multinational corporations (MNCs). It is also a popular IT center of various BPO companies. Gurgaon is one of the most developed cities in the Delhi-NCR region and has the third highest per capita income in the country after Chandigarh and Mumbai. Due to rapid development, the daily demand in Gurgaon is increasing by% every year. This increase in demand cannot be met by energy sources alone, forcing residents, business owners and commercial buildings to switch to renewable energy sources. Among all the renewable resources available, solar energy has become popular in Gurgaon within a short span of time. Currently, Gurgaon has a total installed solar power capacity of over 20 MW, of which rooftop solar forms the largest part. According to Ministry of New Infrastructure and Rehabilitation (MNRE) and National Institute of Solar Energy (NISE), Haryana has a solar potential of 5 GWp. Haryana still has a long way to go to reach its overall target and Gurgaon still has a lot of work to do. But we know that with thousands of rooftops in Gurgaon and Haryana ready for solar power, this potential will soon emerge. Solar energy is now recognized as the main source of energy for the present and the future. Especially in a country like India where coal reserves are estimated to last beyond 2040-50. Haryana in northern India has 300 days of sunshine. Thus, the state has great potential for solar power generation through the installation of rooftop solar power plants across the state. In its Solar Energy Policy 2016, the Haryana government plans to increase power generation through solar methods to 3,200 MWp by 2021-22, of which 1,600 MWp is expected to be achieved throughrooftop PV solar installations. If we talk about the advantages of a solar roof, it saves money, is good for the environment and guarantees a good return…. this list goes on and on. But not only that, Gurgaon has many other reasons why they should go solar and install solar PV units on their rooftops. The state and central government have introduced various schemes, incentives, subsidies and policies to promote solar PV installations.

  1. You can reduce your electricity bill by 20-30% and guarantee the same rate for at least 25 years. For example, if you have a monthly bill of Rs 5,000 by going solar, you can save around Rs 1,100 in the first month and not only in 25 years you will save around 4.4 cents by investing just Rs. 1,100 for the first month. 40,600 Don’t believe us? See for yourself with our solar calculator. ..
  2. Going solar is a unique and risk-free investment with returns between 15 and 30% p.a.
  3. If you own a residential property, you can get a discount of 30%, the maximum is Rs 17,070/kWp from Solar Energy Corporation of India (SECI), but please note that this amount is on a first-come, first-served basis.
  4. The government has introduced an effective net metering policy which will be managed by the Haryana Government Renewable Energy Department (HAREDA) which can feed excess energy back into the grid and this way the user can not save but earn money by switching. for solar energy.
  5. This does not mean that Value Added Tax (VAT), Electricity Taxes, Taxes, Electricity Charges, Transport Charges, Currency Exchange Charges, Transport Charges and Distribution Charges are excluded for ground and rooftop solar purposes.
  6. Elimination of external development costs, monitoring costs and infrastructure development costs during the lifetime of the solar power plant. This provides insight to those involved in civil engineering and more innovative projects, which now helps them easily integrate solar energy into the project framework.
  7. No clearance from the Haryana Pollution Control Board will help speed up the projects.
  8. Large projects of MW size will benefit from 100% exemption from payment and stamp duty for registration of lease/lease of land required for setting up these projects.
  9. Permits and permits are issued to the developer through the one-stop shop (HAREDA) (within 60 days of submitting the entire application, attachments and fees, including the letter of intent).
  10. No processing fee is required for this method but a deposit of Rs 2.00 (Rs 200/kW) is required which will be refunded after signing the PPA.
  11. Users supplying electricity to the grid will be charged 25 paise per unit of electricity bill.

Although all the factors mentioned above won’t help you decide whether you should go on a date or not, the factors below can definitely change your mind. In order to promote rooftop solar installations and achieve its target of generating 3,200 MWp of electricity through solar methods, the state government has mandated some buildings to install 3-5% of their load connected to solar power. First, new residential buildings larger than 500 square meters and residential buildings larger than 0.5 acres must install 3 to 5 percent of the connected load on rooftop solar systems. Second, commercial buildings and hospitals with a connected load above 50 kW and finally government and private institutions with a load above 30 kW must be included in the above 5% of their associated solar system load. And those who do not follow the above rules have to pay a fine from 10,000 to 10 cents. So what are you waiting for in ? Go ahead and go solar. For questions about solar roofs